Revision policy template for designers and studios

A revision policy is half a page the client reads before they sign. It says how many rounds the fee covers, what counts as one, and what happens when the client wants more. The template is below. The rest of the page explains each line.

6 min read

By · Updated

The short answer

Include two rounds of revisions for a typical design or visual job, count them per stage, and define a round as one consolidated list of comments from one named person. Anything that changes the signed brief is a change, not a revision, and is quoted separately. Put the price of an extra round in the quote, so that round four is a line the client already accepted.

The same idea for 3D work, with more on sign-off gates, is in the revision clause for 3D contracts. This page is the version for any studio doing logos, brand work, websites, motion or illustration.

The template

Copy this into your quote or contract and change the numbers. Square brackets mark what you fill in. This is general information, not legal advice. Have the wording checked for your country.

REVISION POLICY

1. Rounds included. The fee includes [2] rounds of
   revisions per stage. The stages are listed in the
   quote: [concepts, design, final files].

2. What a round is. A round is one list of comments,
   sent in one message by [the Client's named contact],
   on one delivery. Comments sent later about the same
   delivery count as the next round.

3. Revision or change. A revision adjusts the work
   inside the approved brief. A change alters the brief,
   the approved concept, the inputs or the scope. Changes
   are not revisions. They are quoted before the work
   starts or charged at [EUR 80] per hour.

4. Extra rounds. Each round beyond those included costs
   [EUR 250] per stage, invoiced when the round starts.

5. Approval. Each stage ends when the Client approves it
   in writing. An email is enough. If no comments arrive
   within [5] working days of a delivery, the delivery is
   treated as approved.

6. Late feedback. If comments or inputs arrive late,
   delivery moves by at least the same number of working
   days.

7. Reopening. Work on an approved stage can be reopened
   only as a change under clause 3.

Put the same numbers in the quote, next to the price. A policy buried on page six of a contract does not get read. A line in the quote that says "2 rounds per stage, extra rounds EUR 250" does.

Why each clause is there

Clause 1 counts per stage. If the contract says "three revisions" for the whole job, the client spends them on logo sketches and has none left for the final files. Per stage, the client keeps rounds for the end, and you keep the schedule.

Clause 2 defines a round. Without it, five people send eleven emails over four days, and the client calls that round one. One named contact collects the notes and settles disagreements on their side. You never find out that the marketing lead and the founder wanted opposite blues.

Clause 3 separates the two things people mix up. A revision is "make the logo larger" or "try the warmer green". A change is "we are rebranding the product line, so use the new name". If it needs new input from the client, it is a change.

Clause 5 stops the silent client. Without a deadline for feedback, a job sits open for six weeks and you cannot invoice the final.

Revision or change of brief

Studios argue about this on calls, so decide it with examples before you sign. These are the cases we see most.

Request from the clientRevision or change
Make the headline 20% largerRevision
Use a warmer greenRevision
Swap the photo for the one from the shootRevision, if it was in the inputs
Add a fourth page to the websiteChange
New product name after the logo was approvedChange
Go back to the first concept after approving the secondChange
Resize the banner to 6 new formatsChange, unless formats were in the quote
Fix a typo we introducedNot a round. Fix it free.

Fixing your own mistakes is never a round. Say so in the policy or in your reply. It costs nothing and removes a fight about the small stuff.

Pricing extra rounds

Price an extra round from the hours a typical round takes you. If a round of changes on a brand guideline takes 3 hours at a 90 EUR hourly rate, an extra round is 270 EUR. Round it to something you can say without a calculator: 250 EUR.

Two ways to set it:

  • A flat price per round per stage. Easy to explain, easy to invoice.
  • Your hourly rate with a minimum of one hour. Better when rounds vary a lot.

If you do not know your own rate, the hourly rate calculator gives a starting point. Then put the price in the quote in the notes line, so the client has seen it before they accept.

How to say no to round 4

Round four arrives politely, usually with the words "just one more small thing". The reply is short and names the clause. Do not apologise and do not explain your costs.

Hi Anna,

Thanks for the notes on v4. We have used the 2 rounds
included in the quote, so this one is an extra round
under clause 4: EUR 250, invoiced when we start.

If you would rather bundle these with the new product
shots, I can quote them together.

Tell me which you prefer and I start today.

Three things make this work. You quote the clause number. You give a price in the same message. You offer a choice, so the client decides instead of arguing. A client who agreed to the number before the job rarely contests it. A client who sees the policy for the first time in round four will.

If the notes are small, such as three lines on spacing, you can include them as a courtesy and say so once: "Included this time, as a courtesy. The next round is under clause 4." Do this once per client, on a job where you are on schedule.

When the client says the work is not what they wanted

Check the brief first. If the delivery matches the signed brief, the next round is a revision and counts. If the client wants a different direction after approving the concept, it is a change.

If the delivery does not match the brief, the round is yours, and it is free. Do not charge for work you got wrong. Put it down as a fix, fix it and move on. The policy works because you apply it to yourself too.

Keeping count

A policy you cannot show counts for little. Keep a record of each round: date, who sent it, how many items, what was delivered in reply. A short list per delivery on the project is enough. When the client says "that was only round two", you open the list and show three dated rounds.

Doing this in OIO

In OIO each stage is a ticket on the client's project. The client views the project for free, with no seat, and each round's notes go on the ticket as a numbered checklist with the date, so the count is written down. The contract with your revision policy goes out from the Legal app for an online signature (a simple electronic signature with an audit trail), and extra rounds go on the invoice from the same project. OIO does not count rounds for you. You write the round on the ticket.

Questions

How many revisions should I include in a contract?

Two rounds per stage is a common starting point. Count rounds per stage, not per job, and define a round as one consolidated list of comments from one named person.

What is the difference between a revision and a change?

A revision adjusts work inside the approved brief. A change alters the brief, the approved concept or the scope, and is quoted separately.

How much should I charge for extra revisions?

Charge the hours a typical round takes times your hourly rate, then round to a flat figure. Write the figure in the quote before the client signs.

How do I say no to a fourth round of revisions?

Name the clause, state the price of an extra round and offer a choice. Keep it to three or four lines and do not apologise.

Free tools for this

OIO for agencies and studios

More guides