Design agency project management: brief to sign-off

A design job goes wrong in the feedback, not in the design. Here is how a studio of two to ten people keeps the brief, the rounds and the sign-off in one place.

6 min read

By · Updated

The short answer

Design agency project management is five things per job: a written brief, a scope with a fixed number of rounds, one place for feedback, one stack of versions, and one sign-off. If those five live on one page, the project runs itself most weeks. If they live in email, Slack and a shared drive, you spend Fridays looking for them.

A studio of two to ten people does not need a heavy system. It needs the same page for every job, so everyone knows where to look.

Where a design job loses time

Take a brand identity job. Three weeks in, the client writes: "Can we go back to the one from last Tuesday, with the blue from the other one?" Nobody knows which file that is.

The same pattern repeats in four places.

  • The brief sits in one email, and the client's later changes sit in four more.
  • Feedback arrives as a PDF with sticky notes, a voice message and a line in a chat.
  • The files are brand_v4.pdf, brand_v5.pdf and brand_v6_final.pdf, and the client opens v4.
  • The sign-off is a thumbs-up emoji, which nobody can point to when the client disputes the invoice.

A project management setup fixes these four before it fixes anything else.

The stages of a design project

Name the stages once and use them on every job. Here is a set that works for branding, packaging and web design studios.

  1. Enquiry. A form or an email arrives. Reply in a day. A short call, 20 minutes, to check fit.
  2. Quote and scope. Written quote with deliverables, two included rounds, 50% deposit, net 14. Usually 1 to 3 days to write.
  3. Brief. The client fills in a brief or you write it on the kickoff call and they confirm it by reply. One day.
  4. Concepts. Three directions for a logo, or two layouts for a site. 5 to 10 working days.
  5. Round 1. Client feedback on one chosen direction. Studio revises in 3 to 5 days.
  6. Round 2. The second and last included round. 2 to 4 days.
  7. Final files. Export, guidelines, handover. 2 to 3 days.
  8. Sign-off and invoice. The client approves the final version. The balance invoice goes out the same day.

Durations are a guide from a typical small studio. Your own last three jobs will give better numbers.

The brief and the scope

The brief is a page, not a document. It states the audience, the goal, three words for the tone, the deliverables, and what is out of scope. Both sides agree on it before concepts start.

The scope states the rounds. Two rounds included and the third billed at the day rate is the common rule. The studio writes it in the quote so nobody is surprised in week four. There is more on this in how to reduce revision rounds and in the quote template.

A brief that sits on the project page and not in an inbox gets read. In OIO the project page holds the brief, the deadline, the budget and the files together, and a signed proposal can sit next to it.

Feedback in one place

Feedback needs a rule: comments go on the work, not in the inbox.

For images, that means a pin on the spot with a number, so "move this" has a location. For video, a comment at a time, such as 00:42. For a PDF, a note on the page. The designer then answers each one, and the client sees which are done.

Three habits help.

  • Ask for consolidated feedback once per round. One person on the client side collects it.
  • Number the comments. "Comment 4" is shorter than "the thing about the logo on the left".
  • Close the round when the studio sends the next version. Comments from round 1 do not leak into round 2.

In OIO the client opens a ticket link without an account, pins comments on an image or comments at a timecode on a video, and the studio sees them on the ticket. See also client approval for video for the same rule applied to moving work.

Versions

Stack versions in order and never rename the old ones. The file the client approved stays in the stack as it was.

A simple naming rule: client_project_asset_v006.ext. Do not add "final" to any file name. The approved version is marked in the tool, not in the file name.

When the client approves, that approval is tied to the specific version, with a date. If the final export later differs from the approved file, you can see it.

Sign-off

Sign-off is a decision that one named person makes about one version.

Send the final version with a plain line: "This is v6. Reply or click Approve by Friday and we send the files and the invoice." The Approve action on the ticket gives you a record. An email reply saying "approved, thanks" also works if it names the version.

After sign-off, the balance invoice goes out the same day. The studio does not wait for the project to feel finished. If you take a deposit, see the deposit invoice guide.

Freelancers on a design job

Many small studios bring in a freelance illustrator or a motion designer for two weeks. Give them one ticket with the brief extract, the files and the due date. They upload their work to that ticket and mark it done. They do not need to see the client's feedback on other deliverables.

In OIO a freelancer works from a link to one ticket and does not use a seat. The studio plan has 5 seats for the people who edit across projects. Check the same question on any tool you try: what does a person who works for two weeks cost?

What to look for in design agency management software

A short list, in order.

  1. A project page per client job, with the brief and files on it.
  2. Client comments on the work without an account.
  3. A version stack and one Approve action.
  4. Quote and invoice from the same project.
  5. Freelancer access without a seat.
  6. A view of every active job and its next deadline.

Resource planning grids and timesheets come later, if the studio grows past ten people. For a wider look at the tools, see how to pick creative agency project management software, and for studios that do brand work, project management for design and branding studios.

A first week with a new setup

Do not migrate old jobs. Start with the next enquiry.

  1. Monday: create the project, paste the brief, attach the signed quote.
  2. Tuesday: send the client the link, ask them to confirm the brief.
  3. Wednesday to Friday: concept work. Upload v001 on Friday.
  4. Next Monday: client comments in the tool. Count them.

By the end of the first job you will know whether the page holds up. Handoff at the end of a job is covered in the project handoff checklist.

Questions

What is design agency project management?

It is how a design studio runs each job from brief to sign-off: scope, rounds of feedback, versions and approval. For a small studio that means one page per client job.

How many revision rounds should a design project include?

Two is common, with the third billed at the day rate. Write it in the quote before the work starts.

Do I need design agency management software?

If you run more than two jobs at once, a shared page per job saves more time than a folder of emails. A spreadsheet is fine for the first year.

How do I get a client to approve a design?

Send one named version with a deadline and one action, such as clicking Approve or replying with the version number. Keep the reply as your record.